RFQ comparison matrix
Compare specification and evidence together.
Use each row as a starting point. Final fields depend on the model, application and destination.
| Line item | Specification to lock | Evidence to connect |
|---|---|---|
| Angle valves | Alloy, thread, cartridge, handle, pressure, finish, packing | Dimensioned drawing, material declaration, applicable leakage-test record |
| Shattaf sets | Sprayer, trigger, hose, bracket, connection, valve, set packing | Set BOM, component photos, connector specification, applicable test record |
| Mixers | Application, mounting, waterways, cartridge, aerator, pressure, finish | Installation drawing, component list, finish master, reports covering the offered model or approved family |
| Flexible hoses | Application, length, bore, tube, braid, ferrules, end connections | Construction sheet, connection drawing, agreed pressure-test record |
| Packaging | Unit box, carton quantity, labels, model identity, destination marks | Approved artwork, packing sample, carton data and final loading list |
Procurement route
From an initial schedule to an approvable scope.
Send the range schedule
Share product type, reference, destination, quantity, target tier and required evidence.
Close specification gaps
Resolve material, thread, components, finish, packing and document questions before comparing price.
Approve controlled references
Use signed drawings, identified samples, finish masters and artwork revisions—not informal chat photos.
Review quotation and gaps
Separate product, tooling, testing, certification, packing, inspection and logistics assumptions.
Inspect before release
Inspect against the locked SKU list, approved sample, carton marks and agreed sampling basis before shipment.
Questions buyers ask
Questions to answer before a purchase order.
Are you a bathroom fittings shop or stockist in Dubai?
No. Gulf Sanitary is a China-side B2B sourcing desk for importers, distributors and project procurement. Stock, shipping route and lead time are confirmed only in a quotation.
Can retail customers buy one bathroom fitting?
This route is designed for B2B quantities, range development and project schedules. It is not a local retail checkout or same-day delivery service.
Which bathroom fitting categories can be quoted?
The current sourcing scope covers angle valves, shattaf sets, mixers, sanitary flexible hoses, brass fittings and manifolds. Exact models and availability are checked against the RFQ.
Are all products ECAS or UAE approved?
No blanket approval claim is made. The current UAE route—including any applicable MoIAT UAE CoC/ECAS, GSO-WER/GCTS, attestation or transition step—must be confirmed for the exact quoted SKU. Product function and final configuration determine technical scope; customs classification is checked separately, and evidence must cover the offered model or approved product family.
Can several bathroom fitting categories share one shipment?
A mixed-category plan can be reviewed after quantities, carton data, supplier compatibility, inspection scope and destination documents are defined.
Can samples and packaging be approved before production?
Yes. The sample, label artwork, carton marks and packing method can be recorded as approval points before mass production.
Who gives the final confirmation on market compliance?
The buyer or importer and the relevant approval authority make the final determination. We help organize model-linked documents and do not describe a product as approved until that status is confirmed.
Can different products share one shipment?
Often yes, subject to carton, pallet, label, destination and loading controls. The workable mix is confirmed against quantities and packing data.
What can change the final price or lead time?
Alloy, finish, packaging, MOQ, documentation, sample approval and the shipping schedule can all affect the final commercial offer.


